Client: Ekoinstal
Location: Świętochłowice, ul. Sztygarska
Realization date: 2006 - 2007
Area: 11.000m2
Location: Świętochłowice, ul. Sztygarska
Realization date: 2006 - 2007
Area: 11.000m2
The company’s seat is situated on the border between Świętochłowice and Chorzów. The architectural context – typical of Silesia – influenced the straightforward, simple form of the building. To avoid direct quotations from the post-German “brick” past, unorthodox choices of materials and wall divisions were resorted to, making reference to small-size building materials, applied, nonetheless, at a greater scale.
The design covers the office building with the possibility of staging its construction into two parts. The volumes of the two stages strongly influenced the architectural form. Part A was designed as a three-storey construction, while the part B was designed on two storeys only.
The building is situated on the so-far undeveloped side of the street, yet the rate of development of the Katowice Metropolitan Area allows a presumption that it shall soon become the reference point for the local development skyline, solids, and forms.


